Medicare In Brief
This article was originally published in The Gray Sheet
Executive Summary
Neurostimulator payments: Medicare reimbursement for outpatient procedures to implant neurostimulator leads would increase 44% under the agency's proposed 2010 Outpatient Prospective Payment System (OPPS) rule, released July 1. The proposed boost follows a double-digit decrease in payment for the same procedure in 2009, which occurred despite protests from Cyberonics, maker of the Vagus Nerve Stimulation System for controlling epileptic seizures (1"The Gray Sheet" Sept. 1, 2008). CMS says the fluctuations in median costs for implantation of neurostimulator electrodes for the cranial nerve and for insertion of left ventricular pacing electrodes "are a consequence of the small number of single bills upon which the median costs are based and the small number of providers of these services." The agency also plans to consolidate the current three APC codes for neurostimulator generator implantation into two. Comments on the OPPS proposal are due Aug. 31; a final rule is expected by Nov. 1
You may also be interested in...
iPhone App Helps Reduce Door-To-Balloon Times In Cath Lab Patients
The latest version of the Lifenet web-based data network from Physio-Control includes a 510(k)-cleared iPhone application called Lifenet Consult that allows cardiologists to monitor chest-pain patients before they reach the hospital and alert hospital administrators that the cath lab will be needed.
iPhone App Helps Reduce Door-To-Balloon Times In Cath Lab Patients
The latest version of the Lifenet web-based data network from Physio-Control includes a 510(k)-cleared iPhone application called Lifenet Consult that allows cardiologists to monitor chest-pain patients before they reach the hospital and alert hospital administrators that the cath lab will be needed.
2010 Device DRGs Stable, But Longer-Term Hospital Cuts Could Make A Mark
Medical device manufacturers are not expected to take a direct hit from Medicare inpatient hospital payment cuts next year, but possible cuts through 2012 could start to add pressure on manufacturers